Table L: Category I Vertical Venting
1
Vent lengths are based on a lateral length of 2 ft. Refer to the latest edition of the NFGC for further
details. When vertical height exceeds 25 ft, consult factory prior to installation.
* Subtract 10 ft per elbow. Max. 4 elbows.
** Adapters supplied by others.
Termination
The vent terminal should be vertical and should termi-
nate outside the building at least 2 ft above the highest
point of the roof that is within 10 ft. The vent cap
should have a minimum clearance of 4 ft horizontally
from and in no case above or below (unless a 4 ft hori-
zontal distance is maintained) electric meters, gas
meters, regulators and relief equipment. The distance
of the vent terminal from adjacent public walkways,
adjacent buildings, open windows and building open-
ings must be consistent with the NFGC (U.S.) or B149
(Canada). Gas vents supported only by flashing and
extended above the roof more than 5 ft should be se-
curely guyed or braced to withstand snow and wind
loads.
Fig. 20: Vertical Venting
Model
No.
Certified
Vent
Material
Vent Size
(in.)
Vertical Vent
Height
1
(ft)
Combustion Air
Intake Pipe
Material
Air Inlet
Max. Length* (ft)
Min. Max. 6” Ø 8” Ø 10” Ø
504
Category I
(Type B
Equivalent)
8
5 25
Galvanized
Steel,
PVC,
ABS,
CPVC
45 100**754 10
1104 10
1504 12
45 85**
2004 14
Comentarios a estos manuales