Raypak LONMARK Y-200 Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
7
Power to the Controller
Observe (follow proper) polarity.
Observe proper wire colors while making electrical
connections.
Provide an external surge suppressor capable of
maintaining system integrity.
Provide overload protection and a disconnect
means for equipment serviceability as required by
local and state code.
Conduit cannot be used as the ground. (There
must
be a “WIRED” ground.)
Very Important: A grounding electrode con-
ductor shall be used to connect the equipment
grounding conductors, the equipment enclosures,
and where the system is grounded, the grounded
service conductor to the grounding electrode.
Fig. 2: Wiring Diagram
Controller Field Wiring
For Single-Stage (ON/OFF) Boilers
A
ll stage connections on the control board are con-
nected at the {TH} (Thermostat) location on the boiler
wiring diagram.
For Multiple-Stage Boilers
First stage connections on the control board are con-
nected at the {TH} (Thermostat) location on the boiler
wiring diagram. Second (or third, etc.) stage connec-
tions on the control board are connected at the
locations shown on the boiler wiring diagram.
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 39 40

Comentarios a estos manuales

Sin comentarios